⚙️
🌟 Najlepsze dopasowanie
Wpisz szukaną frazę, aby zobaczyć propozycje AI.

Pepco opens a new distribution center near Gdańsk

Photo: Pepco

Pepco has officially opened a new 51,000 m² distribution center in Barniewice near Gdańsk, strengthening its European logistics network and supporting the company’s continued growth. Thanks to its strategic location near key road and port infrastructure, the facility will also contribute to the creation of over 250 new jobs in the region.

 

In the first phase, the facility includes a 35,000 m² distribution center, directly managed by Pepco and designed to serve up to 400 stores. In the second phase, the entire 51,000 m² facility will also be equipped with a delivery deconsolidation function, utilizing direct connections with the ports of Gdańsk and Gdynia, which will allow for more efficient handling of goods imported into Poland.

Infrastructure supporting the next stage of development

Pepco currently operates over 4,000 stores across Europe, generating 4.2 billion euros in revenue in 2025. At the same time, the company plans to open more stores in its existing markets. As the store network grows, the importance of infrastructure and operational capabilities that allow for efficient scaling of operations increases. Poland, being Pepco’s home market and the country where more than one-third of the Group’s stores are located, remains one of the key markets for this type of investment.

The opening of the distribution center in Gdańsk is an investment in Pepco’s future growth. We are increasing our operational capabilities while strengthening efficiency, resilience, and control over the supply chain. By building a scalable operational platform, we are creating the foundations for the next stage of Pepco’s development and long-term value creation.

– said Stephan Borchert, Group Chief Executive Officer, Pepco.

Supply chain: from cost efficiency maximization to greater resilience and flexibility

The development of the distribution center in Gdańsk is part of a broader transformation of Pepco’s supply chain. The company is developing a model that combines cost efficiency with greater resilience and flexibility. This includes the ability to use various routes, carriers, and service levels depending on market conditions and business needs.

Gdańsk is an important element of this approach. The center has been designed to ensure a smooth flow of products – from the moment they are received to their shipment to a specific store. A higher share of direct-to-store deliveries translates into higher operational efficiency, fewer intermediate transshipment points, shorter product travel distances, and simpler flow of goods across the entire network.

The center in Gdańsk is an investment not only in additional logistics capabilities but, above all, in the way we want to develop our network in the future. We are building a supply chain that allows us to react faster to changes, better utilize Pepco’s scale, and more effectively support our stores in multiple markets. Gdańsk strengthens this model and gives us greater flexibility in making operational decisions.

– said Javier Rubio Fueyo, Global Sourcing & Supply Chain Director, Pepco.

Gdańsk as a place for testing scalable solutions

The 35,000 m² distribution center in Barniewice will be directly managed by Pepco. This model gives the company the opportunity to test new solutions in real operational conditions, measure their impact, and assess whether they create value that can then be used more broadly across the European network.

One of the elements of this transformation is the Blueprint 2.0 approach – a framework developed by Pepco for the development of a more efficient, repeatable, and scalable operational model for distribution centers. It includes the standardization of processes, performance metrics, technological solutions, and operational standards, while maintaining flexibility where the requirements of individual markets differ.

Pepco’s broader distribution program also aims to increase the efficiency of store deliveries and inventory management. Its goal is to deliver goods to stores faster and at a lower cost, while reducing inventory levels across the entire network.

Strategic location and responsible infrastructure

The center is located 2.5 km from the S6 expressway and 18 km from the ports of Gdańsk and Gdynia. The location supports both domestic flows and intermodal transport, as well as more efficient connections between deliveries and the distribution of goods to stores.

The facility is equipped with a photovoltaic installation, energy-efficient lighting, and infrastructure for charging electric vehicles. The project was prepared with the intention of obtaining BREEAM Excellent certification. The center will also be a significant source of employment in the region – its operations involve the creation of over 250 new jobs, including in the areas of logistics and operations, IT, HR, health and safety, and inventory management.

The center in Gdańsk strengthens the infrastructure supporting Pepco’s further growth in Europe. By combining additional operational capabilities with greater efficiency, resilience, and control over key processes, the investment will help the company grow its store network and support its operations in individual markets even more effectively.

 

Source: Pepco