
Logistics operator Dachser is preparing a new headquarters for its Warsaw branch. It will be located near Warsaw, in the MLP Pruszków II logistics complex, right next to the A2 motorway. The opening of the new branch is planned for the spring of 2013.
The emerging branch will consist of a two-story office with an area of 750 sq m and a warehouse with an area of 7,200 sq m. In the future, it will be possible to expand the complex. As in every Dachser branch, warehouse operations will be carried out using high-class, proprietary WMS and TMS systems. The A-class warehouse will have 19 loading docks. High-bay racking is planned to accommodate 8,000 pallets. The lighting used in the warehouse will be energy-efficient and compliant with the HACCP system. The facility will be adapted to fire loads exceeding 4,000 MJ/sq m. The fenced and guarded area will include a maneuvering yard along with a parking lot for 25 trucks.
– The investment in Pruszków is the implementation of the next stage of the company’s development strategy adopted in 2010 – says Grzegorz Lichocik, President of Dachser in Poland. – This is an extremely important location for the company, especially because of its position directly by the motorway. A tangible benefit for us and our customers will be the reduction of transport time in the region, which can be very burdensome due to the congested capital city. Now our trucks will be able to bypass the city without any problems.









