
Logistics operator DACHSER has opened a new warehouse in Malsch near Karlsruhe, Germany. The facility covers an area of approximately 22,000 square meters and is designed for handling hazardous materials. DACHSER has invested over 20 million euros in the German warehouse.
Baden-Württemberg is a region with high revenues in the chemical industry, which is why there is a significant demand for logistics services for hazardous goods here. The DACHSER logistics center in Karlsruhe has become a key logistics hub for handling chemical shipments within the operator’s European network. The facility has an excellent location and connection to France, which is the main destination for German chemical exports.
– The constantly growing demand from the chemical industry made the construction of a new facility an absolute necessity – says Bernd Großmann, General Manager of DACHSER Malsch.
The new warehouse can accommodate 43,000 pallets. The facility was specifically designed to allow for the proper storage of chemical products, such as paints, coatings, and adhesives. It is divided into nine sections separated by firewalls. Each individual part of the warehouse is equipped with an automatic fire extinguishing system with ceiling sprinklers and in-rack sprinklers. The floors are designed to contain any potential chemical or firewater spills. In turn, barriers at sewer manholes provide additional protection for groundwater.
The construction of the new warehouse took less than a year. Currently, the facility is fully operational. All stages of hazardous goods logistics are carried out through direct, daily connections with the entire DACHSER European network.
Source: DACHSER








