Hazard and Operability Analysis (HAZOP) is a risk identification technique that examines hazards related to operational problems associated with the functioning of technical infrastructure. HAZOP is based on the assumption that risk arises from events that do not proceed according to plan, and it seeks risk in deviations from design intent.
Initial HAZOP applications concerned almost exclusively industrial uses. HAZOP procedures evolved from internal control tools and, in their original form, concerned the assessment of completed infrastructure facilities in terms of possible operational hazards. They were introduced to eliminate potential problems related to safety, fire regulations, maintenance of technical execution standards, etc. Currently, there are many variants of risk analysis techniques derived from and based on HAZOP. Some of these solutions can be used for risk assessment needs in transport infrastructure. The aim of this article is therefore to assess the usefulness of existing practical tools used to conduct HAZOP studies for the needs of risk assessment in transport infrastructure investments. This assessment was carried out by analyzing existing procedures for individual HAZOP techniques and examining the possibilities of their application in the planning, construction, maintenance and operation, renewal, and decommissioning phases of infrastructure. It is worth noting that most of the functioning methods of risk identification and assessment in transport infrastructure focus on its assessment before and during project implementation, and a shortage of similar procedures in the infrastructure operation phase must be noted. The conclusions from the assessment of various HAZOP techniques indicate that it is a tool that allows, at least partially, to fill this gap.
Risk in transport infrastructure
Risk assessment in transport infrastructure is a standard activity in the investment phase of the process of creating new infrastructure. In this phase, risk assessment is forced by legal regulations and is also of great importance for determining the effectiveness of the planned investment. However, risk in an infrastructure investment can also appear at other stages of its “life cycle”. In particular, it will manifest itself long-term in the operational phase, which, depending on the type of infrastructure facility, may cover from several to over a dozen years. Existing risk assessment methods focus on the pre-investment phase and the implementation phase of the investment itself. This is due to the short time perspective that facilitates assessment and the tasks set before risk analysis. In the case of pre-investment and investment phases, it is about answering the question of whether the investment will be completed on schedule and whether it will be completed within the planned costs. These are key questions from the point of view of obtaining funds for project implementation. It is also not without significance that risk in the investment phase generates very severe consequences. Its realization often eliminates the possibility of completing the construction of the infrastructure. On the other hand, the operational phase does not generate risk (with some exceptions – risk leading to immediate destruction of the facility – risk of collapse, explosion, etc.) of such a radical dimension. It is characterized by the extension of risk over time and its relatively long accumulation. In the operational phase, typical risk elements can be distinguished: economic (including especially insufficient revenues), safety, technical, personnel, random events, or force majeure. Key from the point of view of the possibility of using the infrastructure is the risk that directly affects the quality and safety of using transport infrastructure and ensuring uninterrupted access to infrastructure, and thus ensuring the uninterrupted provision of transport services. These elements are most influenced by those risk components that directly affect the technical condition of the infrastructure. These are most often the risk of random events and force majeure, safety, and technical risks. At the same time, their consequences entail specific costs, which is why they can secondarily influence the increase in economic risk. For an infrastructure manager, it is therefore key to find a tool enabling the identification and measurement of this type of risk. A proven solution characterized by high flexibility enabling application in the scope of examining infrastructure in various branches of transport is the HAZOP procedure.
The article contains 23,860 characters.
Source: Logistyka Magazine