The impact of using a wagon shunter on the efficiency and costs of railway wagon loading processes

The impact of using a wagon shunter on the efficiency and costs of railway wagon loading processes

The processes of unloading and loading goods onto railway wagons are significantly more problematic to organize than loading road vehicle semi-trailers. This is due to the large volume of transported cargo, very often large dimensions, and the necessity of repositioning wagons and performing numerous shunting operations that generate high costs, a significant portion of which is caused by locomotive operation. To reduce these costs, it is necessary to seek new organizational and process solutions that very often involve changing the entire system of loading or unloading goods.

This article will consider the option of using a wagon shunter (shunting device) for pulling railway pendulums at a finished goods warehouse. The described system can be used both for loading goods onto wagons and for unloading them.

Loading system
In international transport, containers are very often used, which facilitate the change of transport mode and increase cargo safety. Containers are transported using two-axle platform wagons of the Ks and Kgns types. The system for loading goods into containers is most often based on loading with forklifts directly from the warehouse via a loading ramp into containers located on railway wagons. Such a system allows for avoiding the removal of containers from wagons and transferring them to a storage yard, thus avoiding additional loading activities; however, on the other hand, it causes the tracks at the finished goods warehouse to be blocked for the duration of loading. Furthermore, it is required to position wagons in the form of pendulums with a length corresponding to the length of the loading ramp, and it requires ordering a shunting locomotive each time after loading to remove the loaded wagons and position subsequent wagons with empty containers, which generates significant costs resulting from the long operating time of the locomotive.

In order to shorten the waiting time for the locomotive to be positioned, it is possible to use a shunting device. The use of a shunting device is possible only where there is an appropriate track layout – trackage before and after the loading ramp of sufficient length and not conflicting with other trackage and road infrastructure (allowing for the parking of wagons without disrupting other transport processes). Furthermore, it is important to ensure appropriate conditions on the track – it cannot be contaminated, e.g., by dust, flooding, or solid loads falling onto the track. The installation of a shunting device is possible on tracks in good general technical condition. The track construction standard must correspond to the track surface construction standard for class 4 tracks. The technical conditions for the maintenance of railway surfaces on railway lines are defined by the ID-1 instruction for tracks with a rail gauge of 1435 mm.
This article considers the installation of a shunting device in the track, i.e., a towing carriage directly moving the wagon train, moving along a guide attached between the rails on supports made of steel sections, moved in both directions (forward and backward) by means of a rope. The applied wagon shunter allows for moving trains weighing up to 2000 tons.

The article contains 15,230 characters.