
Risk management is the avoidance of undesirable events throughout the entire life cycle of an object (system, process, organization). Risk management means minimizing risk, i.e., minimizing the probabilities and/or consequences (losses) of potential undesirable events (situations) in the managed system.
Risk as an object of study is multifaceted and multiform. Regardless of its form and the level of management, however, three issues must be considered:
- how to estimate the risk of possible threats in the considered system?
- what range of risk can be accepted?
- how can the accepted range of risk be achieved?
The first issue corresponds to risk analysis, the second to risk assessment, and the third to risk control. Together, they make up risk management, and this is perhaps one of the simplest definitions. It can be found in the IEC 60300-3-9 standard: risk management is the systematic application of management policies, procedures, and practices to the tasks of analyzing, determining, and controlling risk (IEC 60300, 1995).
Risk management in engineering
The risk management process can then be written in the form of the following scheme:
risk management = risk assessment + risk control
risk assessment = risk analysis + risk evaluation
risk analysis = risk definition + risk identification + risk estimation
A more precise interpretation of the risk management process is provided by the standard developed in 1999 by the Joint Standards Australia/Standards New Zealand Committee OB-007 (AS/NZS 4360, 2004). Here is the definition of risk management: a term applied to a logical and systematic method of communicating, establishing the context, identifying, analyzing, evaluating, treating, and monitoring risks associated with any activity, function, or process that enables organizations to minimize losses and maximize opportunities.
In the AS/NZS 4360 standard, the iterative risk management process consists of seven basic elements:
1) communication and consultation;
2) establishing the risk context;
3) risk identification (risk sources, accident scenarios; risk exposures);
4) risk analysis;
5) risk evaluation;
6) risk treatment;
7) monitoring and review.
The article contains 18,790 characters.
Source: Logistyka Magazine








