The impact of the condition of railway line no. 131 infrastructure on the reliability of the transport system in the Pomeranian Voivodeship

Railway line no. 131 Chorzów Batory – Tczew is of key importance in Poland’s transport system, connecting seaports with Upper Silesia, the country’s economic hinterland. However, underinvestment in railway infrastructure and years of maintenance neglect have led to significant difficulties in the proper functioning of this line. The real threat of traffic restrictions on line no. 131 in the Pomeranian Voivodeship could lead to instability in the already overloaded road transport system. The situation requires the identification of alternative railway connections, which have often been overlooked and undervalued for years.The Pomeranian Voivodeship occupies a special place on Poland’s transport map.
The port infrastructure located in the Tri-City and the recently established maritime transshipment terminals significantly determine the type and quantity of cargo transported in the region, especially in the Tri-City metropolitan area. (…)

The article contains 22,966 characters.

Source: Logistyka Magazine

The impact of the condition of railway line no. 131 infrastructure on the reliability of the transport system in the Pomeranian Voivodeship – PDF file for download