Network Expert
⚙️
🌟 Najlepsze dopasowanie
Wpisz szukaną frazę, aby zobaczyć propozycje AI.

PPL prepares for terminal renovation

Polish Airports (PPL), the operator of Warsaw Chopin Airport, has announced a tender for a general contractor to renovate the old part of the airport terminal. Zone AB (formerly known as Terminal 1) will be closed to passengers immediately after the conclusion of UEFA EURO2012™.

PPL prepares for terminal renovation

The terminal building designated for modernization was constructed in the early nineties. Its current technical condition requires a thorough renovation. On this occasion, the old part will be modernized and fully integrated with the new part. After the reconstruction, the entire Terminal A will form a single structure that is completely uniform in terms of architecture, technology, and functionality. The opening of the renovated part of the Warsaw airport terminal is planned for the end of 2014.