Greater opportunities for freight traffic in the Dąbrowa Basin

Greater opportunities for freight traffic in the Dąbrowa Basin

For PLN 29 million, PKP Polskie Linie Kolejowe S.A. will increase freight handling capabilities on routes near Dąbrowa Górnicza. Three important railway lines will ensure faster transit and more efficient handling of freight trains. Disused tracks will be cleared. New control devices will increase the level of traffic safety.

The investment will improve freight traffic on very important freight lines No. 154 between the Łazy – Dąbrowa Górnicza Towarowa stations and No. 171 on the DG Towarowa – Kozioł and Dąbrowa Górnicza Towarowa – Panewnik sections. Better conditions for freight transport will be enabled by new train traffic control devices installed in the new (DTA) and modernized (DTC) signal box at the Dąbrowa Górnicza Towarowa station. The DTA signal box will ensure efficient train operation also in the area of the Okradzionów post, which has been inactive for years. The facility will replace 3 existing signal boxes and will handle all traffic of trains arriving at and departing from the Dąbrowa Górnicza Towarowa station, both towards the Łazy station (via Okradzionów – line 154) and Dąbrowa Górnicza Wschodnia (via Kozioł – line 171). The DTC signal box will cover the existing two shunting districts and will take over the management of shunting traffic between the Dąbrowa Górnicza Towarowa station and the sidings of large industrial plants such as ArcelorMittal or Koksownia Przyjaźń. Modern, computer-based train traffic control devices will be installed at both signal boxes, increasing the station’s transport capacity while significantly increasing railway traffic safety. As part of the task, 19 turnouts and approx. 5 km of overhead contact line will be replaced, among other things. In the field, signals, lighting, communication systems will be replaced, and monitoring will be installed. Efficient train travel in winter will be guaranteed by electric turnout heating.
The reconstruction of railway traffic control devices at signal boxes and the restoration of the junction post is being carried out as part of the task “Works on the south-eastern bypass of the Upper Silesian Industrial Region (GOP) along with adjacent sections on lines No. 154, 171, 661”. The works will be completed in the fourth quarter of 2017. The value is PLN 29 million.
PKP Polskie Linie Kolejowe S.A. consistently carries out activities aimed at better rail transport. This is done by restoring decommissioned station tracks to service, increasing the capacity of important freight transport corridors, and ensuring more efficient departure of freight trains from Silesia. Last year, over 90 km of tracks were renovated in the region for over PLN 100 million. In 2016, over 80 km of tracks will be renovated in Silesia for PLN 104.5 million.