The paper presents the production process of reinforced concrete power poles of the śN type used for the construction of low-voltage power lines. When determining the performance and organizational parameters of the production process, the occurrence of random conditions was assumed. Their influence was expressed by the variable duration of total activities at subsequent workstations. Probability density curves for the occurrence of the assumed total duration of activities at a given workstation served as a graphical interpretation. The assessment of the probability of the initially assumed production process parameters occurring was carried out using the Monte Carlo simulation method.One of the basic performance parameters that must be determined at the production process design stage is production capacity. It defines the theoretical quantity of products manufactured per unit of time, assuming full reliability of the production process.
In production practice, however, there are events whose precise inclusion at the design stage is quite complicated. (…)
The article contains 13351 characters.
Source: Logistyka Magazine