In recent years, many new logistics facilities have been built in Poland. Does the level of Polish logistics infrastructure match the European standard?
<\/strong><\/p>
PhD Eng. Ireneusz Fechner, Professor at the Institute of Logistics and Warehousing<\/strong><\/em>: <\/em>Logistics infrastructure is made up of various elements. Let us focus on just two, albeit very important ones: warehouse facilities and transport infrastructure. As far as the warehouse space market is concerned, 2016 was already pointed out as a record-breaking year, and after an equally promising preceding year, it seemed it could not get any better. But it did! 2017 was another record year, and the word ‘record’ is the most appropriate one that comes to my mind. In 2016, investors, including primarily industrial developers but not only them, delivered over 1.1 million square meters of new space to the market. Meanwhile, last year that figure was over 2.3 million square meters, which is twice as good a result as the previous one. If nothing extraordinary happens, then by tracking investments started in 2017 that will enter the market this year, it will be at least as good as the previous one, because at the turn of 2017 and 2018, there was about 1.3 million square meters of warehouse space under construction. And we still have nine months ahead of us during which investors will not be idle. The strategy for delivering new space to the market has changed. Previously, these were mainly universal facilities, and many of them were completed without preliminary lease agreements. In 2017, although the demand reported by the market was impressive, the share of new space built on a speculative basis was lower than in previous years, and many warehouses were built as BTS (Built to Suit) investments. This last change stems mainly from the very dynamic development of e-commerce, because servicing online trade requires a different type of warehouse facility than traditional warehouses intended for contract logistics.
Domestic warehouse facilities and warehouses are no different from similar facilities in other parts of Europe. This applies not only to commercial large-area facilities for rent but also to specialized warehouses, for example, high-bay warehouses of manufacturing enterprises. And this concerns not only warehouses whose construction was financed by foreign capital, often perceived as a source of innovation, but also domestic capital, an example of which could be the high-bay warehouse of the AMICA enterprise in Wronki. Regarding modernity and innovative solutions in warehouses in Poland in terms of equipment and storage technology, it is worth noting the activities of the Poznań-based company PROMAG S.A., whose “Warehouse of the Future” at the Warehouse Technology Center demonstrates the capabilities of a domestic enterprise in creating innovative solutions on a global level.
I would like to comment on the second element of logistics infrastructure in relation to warehouse infrastructure. It is a platitude to say that EU funds have become a source for the expansion of road infrastructure, which is looking better and better, that railway infrastructure, after a long period of stagnation, is also undergoing intensive modernization, and finally, that the infrastructure of inland waterway transport remains in a sorry state. Everyone sees how it is. But the worrying fact stands out that not all national and provincial roads allow for transport operations with an admissible axle load of 11.5 tons. What must be particularly frustrating for carriers is the fact that some of the tonnage restrictions have nothing to do with the technical quality of the roads but originate from legal regulations, as pointed out by the Transport and Logistics Poland Employers’ Association. Through administrative methods, on some roads under local government jurisdiction, an admissible axle load of 10 or 8 tons has been introduced. There is no need to talk about the consequences this has for the utilization of truck load capacity and the necessity to increase their number to transport a specific mass of goods. Already in 2016, Maciej Wroński, president of the Transport and Logistics Poland Employers’ Association, pointed out that it is impossible to legally reach any container terminal in Poland with an axle load of 11.5 tons. I believe the same could be said in the case of warehouse facilities. Of course, carriers can apply for permits for the passage of non-standard vehicles, but this is not a solution that eliminates the problem; it is an additional hurdle. If the transport takes place on a road whose segments are under the jurisdiction of several local governments, the carrier must apply for a separate permit for each road segment.
In summary, much good can be said about the national logistics infrastructure A.D. 2017. However, for it to fully serve the economy and its development, one must also see the problems and be willing to solve them.<\/em>
<\/em><\/p>







