This paper aims to present methods for schedule optimization with an emphasis on verifying the usefulness of task scheduling rules applied in flow production systems. These methods have been successfully used in industrial production for years; however, the construction industry is a special case, and none of these methods can be transferred to this environment directly. Nevertheless, the results of this work confirm the validity of applying some of them, subject to obvious additional constraints and comments.The construction schedule is one of the fundamental organizational tools for any construction project. The correctness of the assumptions adopted in it has a direct impact on the duration of the construction cycle and many economic aspects of construction work.
From the investor’s point of view, the schedule should assume the shortest possible execution time. (…)