The final building at Poznań Airport Logistics Centre is now complete

The final building at Poznań Airport Logistics Centre is now complete

GLP, an international company specializing in logistics real estate, digital infrastructure, renewable energy, and related technologies, completed the construction of the third building at the Poznań Airport Logistics Centre in March 2023. This marks the final stage of the investment, which comprises a total of over 81,000 sqm of warehouse and production space.

The newest building in the GLP logistics park, located 5 minutes from Poznań-Ławica Airport, spans over 28,600 sqm. The facility was built in accordance with BREEAM environmental certification requirements.

The building offers storage heights of up to 12 meters, reinforced flooring with a load capacity of 7.5 tons per square meter, and improved natural lighting in the dock area thanks to an above-standard number of skylights. The roof is prepared for the installation of photovoltaic panels. Other eco-friendly solutions in the park include electric vehicle charging stations and a bicycle parking shelter. The project also incorporates green areas, and drivers have access to dedicated restrooms.

The building is already being used by a leading medical equipment manufacturer. There are still 17,000 sqm of available space waiting for interested tenants.

– Poznań Airport Logistics Centre is a prime location near the passenger and cargo terminals at Ławica Airport, 20 minutes from the city center and 10 minutes from the A2 motorway. With the entire investment now complete, we are focusing on leasing the remaining vacant space. Our clients will benefit from a top-quality building equipped with a range of above-standard technical solutions – says Paweł Żeromski, Business Development Manager at GLP.