and subsequent regulations concerning it, it assumes the implementation of an integrated River Information Services (RIS) system on the inland waterways of the European Union, allowing for increased safety and environmental protection. The introduction of the RIS system applies only to waterways that have at least class IV status and are connected to the European waterway network.A large part of Europe’s rivers are classified as the highest category of waterways, but Poland has the fewest of them. Only short sections of the Oder and Vistula rivers actually meet the minimum class IV requirements. For this reason, our country’s government requested an extension of the deadline for the implementation of the RIS system from 2007 to 2013. Its introduction applies only to the lower section of the Oder due to meeting the class IV requirements as well as its connection with Germany.
Commission Regulation (EC) No 415/2007 concerning Directive 2005/44/EC of 2005 assumes, among other things, the introduction of an Inland Automatic Identification System (Inland AIS) allowing for the control and tracking of vessel traffic. The inland AIS system is compatible with the AIS introduced by the International
Maritime Organization (IMO). This allows for the direct exchange of information between these systems. This is important in mixed traffic zones, where both sea-going and inland vessels may be present. This type of situation occurs on the Oder starting from Szczecin. (…)
The article contains 26,728 characters.
Source: Logistyka Magazine 6/2011








