Simulation of a logistics production system using the Dosimis-3 package – part 2

Simulation of a logistics production system using the Dosimis-3 package - part 2

Simulation of a logistics production system using the Dosimis-3 package – part 1

It enables the analysis of the causes and locations of disruptions, bottlenecks, and interruptions in material flow that arise during system operation, thereby counteracting undesirable effects that reduce the efficiency of the entire enterprise system.

This simulator also allows for the analysis of the system in which the material is located: whether it is being transported, processed, or waiting for the transport or processing process to be carried out. On the built model, research can be conducted to optimize the transport and storage system cooperating with the adopted production subsystem. A typical simulation model built in the Dosimis-3 package consists of the steps shown in Figure 3.
Information and input data are necessary to develop a logistics model of the production system. Priorities can be assigned to inputs and outputs, which is crucial for receiving and delivering material from multiple devices. Furthermore, input data allow for the development of a process model with appropriate detail according to the principle of the minimum number of objects required to achieve project goals. Basic information about the built model of the manufacturing system in the metallurgical industry includes, among others:

  • information about system objects (type and number of machines, means of transport and their maintenance schedules, organization and layout of production stations),
  • system capacity (production plan, batch size, product assortment),
  • number and capacity of input, output, and inter-operational warehouses,
  • sequence of production orders,
  • time for retooling production for a different product type,
  • material costs, direct labor, workstation costs, overheads, etc.

For the purposes of optimizing the transport system in simulation studies, the following were primarily analyzed:

  • duration of the entire technological process,
  • time for rebuilding rolling mills after a completed rolling campaign,
  • influence of transport equipment parameters on the time of completing a production task,
  • influence of transport equipment parameters on the downtime of production units,
  • degree of utilization of transport equipment for the completion of a production task.

The basic relationships between the elements of the hot steel strip rolling mill system result from the material flow schedule and the determination of the time required to complete a logistics task. This model was used to control the material flow in a given rolling mill in order to optimally utilize production and transport equipment, as well as to determine the lead time for orders and the production costs of the finished product. The research program included a simulation of the system’s operation, the structure and attributes of which correspond to the structure and attributes of the real system. The simulation studies were mapped based on the duration of 50 rolling campaigns carried out in a given rolling mill over a period of 2 months.

The article comes from the magazine “Logistyka” 2/2012.