Delivering crane girders from the port in Gdańsk to the factory was a major challenge. The largest of them were 50 meters long and weighed 80 tons. To ensure efficient and safe transport, an unconventional solution was chosen – a specialized barge for oversized cargo transport.

The task involved unloading crane girders from ships and delivering them, along with additional components such as electronic equipment, to the construction site of an offshore wind tower factory. As part of the project, over 200 components were transported from the port to the shipyard areas in Gdańsk. The largest girders were 50 meters long, 2 meters wide, 4 meters high, and weighed as much as 80 tons.

Due to their size and weight, as well as the direct waterway connection between the port and the shipyard, the transport of the largest loads was carried out on specialized barges. Loading was performed using two ship cranes working simultaneously in tandem. This allowed the goods to go directly from the ship to the barge, which saved time and avoided unnecessary transshipments on the quay. Upon arrival at the destination, the components were unloaded by quay cranes and a floating crane, and then transported to storage yards. The remaining, smaller elements were transported by land.

This solution allowed the client to:

  • Optimize oversized transport
    Transport on barges eliminates many problems that would be encountered on the road with such long and heavy loads – bypassing viaducts and bridges, as well as traffic lights or road signs. This means there is no need to dismantle signs and traffic lights, and it does not require organizing permits and pilotage.
  • Fewer transshipment operations
    Direct unloading from the ship to the barge reduced the time required for transshipment and increased transport safety.
  • Efficiency and time savings
    Utilizing the shipyard quay, which is adjacent to the factory, allowed for the delivery of a larger quantity of cargo in a shorter time.

    The project also provided comprehensive customs clearance, and the transport of all elements within the shipyard area was organized – from storage yards to the factory site where the cranes will be installed.