In the life cycle of every enterprise, there periodically arises a need for reorganization and rationalization, both in relation to organizational structures and implemented processes, or the physical construction of the system and the layout of facilities. Such a necessity may result from many factors, both external, such as changes in legal conditions, the development of available technologies, or shifts in market power, as well as internal ones, including changes in management and business strategy. Depending on the needs and driving factors, the scope of such reorganization may vary, and consequently, the time of its implementation and, likely, the costs it will entail. Regarding the aspect of workstation layout, the scope of reorganization may include the following variants:
-
complete reconstruction of the layout resulting from changes in the structure of the production cell, for example, changes in the production assortment, changes in technology (this case does not essentially differ from designing new production cells)
-
complete change of the existing layout resulting from the need to improve production organization and working conditions
-
complete change of the existing layout due to the replacement of part of the machinery park, introduction of a multi-workshop system, etc.
Regardless of the chosen scope, the reorganization of workstation layout is a result of and should accompany changes of a broader nature, concerning the method of work organization, i.e., material flow management, which in turn requires appropriate organization of information flows.
The article presents a comprehensive proposal for the reorganization of material and information flows, using the assembly area as an example, which is justified as this area is often currently key to business success, as it strongly influences the level of customer service by ensuring products consistent with their expectations. The approach used in the article is based on the predominance of synthesis and deduction methods. In the approach dominated by synthesis and deduction methods, also called systemic, the starting point is the development of a synthetic concept of the entire solution, and then its gradual adaptation to existing conditions. Methods derived from this approach can be called differential, due to the gradual departure from the ideal solution.
Analysis of preliminary conditions
In the analyzed machinery industry enterprise, a reorganization was carried out based on assumptions regarding work organization in the entire production system. These assumptions include material supply driven by consumption and demand, depending on the qualification of the assortment group, i.e., partial decentralization of production control. To enable control decentralization, cells performing assembly operations, along with supply (parts warehouse) and output (finished goods warehouse), should be grouped. Due to the hybrid approach and the division of the assortment into two categories:
-
A – with a large number of produced units, and consequently, daily production repeatability
-
B – with a relatively small number of produced units and low repeatability
which results in the division of assembly cells into groups performing operations related to a given assortment group:
-
for products in category A (fast-moving, identified based on sales data), a processing cell with a three-station warehouse in the form of a supermarket, to ensure continuous availability of parts and standard components necessary for the assembly process. This cell handles slower-moving products that are technologically similar, but the parts necessary for their execution are delivered to workstations based on orders, recorded using kanban cards,
-
for products in category B, slower-moving, technologically different from category A products, the parts necessary for their execution are delivered to workstations based on orders, recorded using kanban cards.
Work organization and workstation layout in Assembly Cell A
In Assembly Cell A, small products belonging to the group of technologically similar products will be assembled. Within the line, assembly, quality testing, painting, and packaging are carried out, with the recommendation that parts be delivered to assembly in the highest possible state of preparation to streamline the assembly process and limit the amount of space occupied by parts for a single product for efficient supermarket organization. In Assembly Cell A, it is essential to ensure appropriate efficiency, and thus, continuity of flow.
The article comes from the magazine “Logistyka” 4/2011.