More and more intermodal on the Rail Baltica route

More and more intermodal on the Rail Baltica route

At the beginning of March this year, the Baltic railway consortium RB Rail, responsible for planning and utilizing infrastructure on the Rail Baltica route, approved the Operational Plan for the years 2026-2056.

According to the published document, on the Rail Baltica route – a trans-European corridor connecting Helsinki, Tallinn, Riga, Vilnius, Warsaw, and Berlin – as much as 80% of rail transport is expected to consist of intermodal freight. As a result, logistics operators will be engaged to handle the transport of containers and heavy goods vehicles on rail platforms. This will contribute to improved safety through a significant reduction in emissions and the mitigation of congestion. Freight trains are expected to operate at a maximum speed of 120 km/h. The schedule provides for 2-3 train sets per hour with a length of up to 1050 m and a maximum axle load of 22 tonnes. To support these operations, the launch of three large multimodal terminals is planned, located within the Baltic states: Estonia, Lithuania, and Latvia.

Sources: www.transportjournal.com and www.railbaltica.org.