
DB Schenker has added its 18th facility to its network of terminals in Poland. The new investment, worth over PLN 50 million, is located in Toruń at ul. Przelot 74, in the Toruń Wschód investment and logistics zone. The official opening of the terminal took place on Friday, May 12, 2023, and was attended by representatives of DB Schenker, local government authorities, representatives of universities and the media, as well as special guests, including Jowita Michalska, founder of Digital University, organizer of the Masters&Robots conference, and ambassador of Singularity Group in Poland.
“I am pleased that Toruń is strengthening our distribution network, becoming another major investment in this area over the last four years. In all our projects, we set three important goals: for the buildings to be friendly and safe for employees, to be as operationally efficient as possible to serve the business, and, importantly, to meet the highest environmental standards. This is a source of pride, but also our contribution to achieving an ambitious global goal: reaching zero emissions by 2040,” says Piotr Zborowski, CEO North & East Europe at DB Schenker.
“The new branch in our logistics network not only increases the company’s operational capabilities but also creates opportunities for business development for current and potential customers. Thanks to the new location, we are further increasing the frequency of connections and shortening the logistical distance between shippers and recipients of shipments, especially in central Poland. The cross-dock terminal in Toruń is distinguished by its excellent location, near major transport routes, with convenient connections in virtually every direction. The new facility is also a modern, friendly, and safe workplace for our employees, drivers, and carriers,” says Władysław Kiczak, Vice President Land Transport Cluster Northeast Europe at DB Schenker.
Event participants were also treated to a tour of the new terminal, during which they could see up close how this modern facility, designed according to ergonomic principles and with a focus on reducing environmental impact, functions. By the second half of 2023, the terminal in Toruń will use only green energy derived 100% from wind and photovoltaic farms. This is the fifteenth DB Schenker terminal powered by green energy. The facility is applying for BREEAM (Building Research Establishment Environmental Assessment Method) certification, which defines the highest standards in terms of ecology and user comfort.
New DB Schenker terminal in Toruń – facts
- On a plot of nearly 41,000 m2, a transshipment hall with an operational area of over 4,800 m2 was built, along with a modern office with social and sanitary facilities for employees and suppliers, which accounts for an additional 660 m2.
- The terminal is equipped with 54 docks for trucks and a special ramp for snow removal. Additionally, there is an electric vehicle charging station on the premises.
- The facility is located right next to the Lubicz junction of the A1 motorway. It is situated near major transport routes, with convenient connections in virtually every direction, which contributes to efficient and uninterrupted goods delivery.
- The building has been equipped with, among other things, an integrated traffic light system covering the ramp and docks to enhance safety during the unloading or loading of shipments.
- The design includes water-saving solutions and energy-efficient, automatic LED lighting. The terminal is equipped with a modern BMS (Building Management System), allowing for efficient monitoring and management of energy resources.
- The building was constructed in accordance with BREEAM principles and is currently undergoing certification. Excluding the company’s drivers and suppliers, 53 people will work there.
- The terminal was built in cooperation with Panattoni.







