The construction site layout is developed at the design stage as part of the implementation assumptions, and is then refined by the general contractor. The costs of site development range from 1.6 to 5.5% or more of the value of the facilities being built on a given construction site. For an investment with an estimated value of several or several dozen million PLN, these are significant amounts, forcing the construction contractor to seek optimal solutions, e.g., in the direction of controlling the management of distribution and storage on the construction site.
1. Introduction
A construction site is a designated area where construction, assembly, auxiliary, and service processes related to the construction of a specific facility or group of facilities take place [1,5]. The size of the construction site depends on the nature of the technological processes associated with the construction and its duration, while always resulting from local conditions. Every construction site should take into account the functional needs of the construction contractor and the economics of organizational solutions. The costs of site development range from 1.6 to 5.5% or more (some sources state from 2 to 7%) of the value of the facilities being built on a given construction site. The lower share applies to easily accessible and serviced construction sites. These costs increase in cases of unserviced areas and with difficulties, such as those occurring during projects in city centers and on so-called “infill” construction sites.
The article contains 11,999 characters.
Source: Logistyka Magazine 6/2009
Managing organization and distribution on a construction site – PDF file for download