Assembly line balancing
The first assembly line for the Ford T was designed in 1913, thereby revolutionizing the mass production process. The introduction of this type of production allows for a significant acceleration of production while simultaneously reducing its costs.
Today, production systems based on flow production lines are ubiquitous and apply to most products. The phenomenon of assembly line balancing was first described in the 1950s. The basis of the balancing problem is the assignment of a set of tasks to an ordered set of workstations so that precedence relations are met and quality indicators are optimized. An assembly line is considered balanced when all operations have been performed without violating any of the assumptions regarding assembly line production (indivisibility of operations, adherence to precedence relations). Although the balancing problem has been known for years, new algorithms and modifications to already known algorithms are still being proposed. In the literature, we can encounter many models, structures, or classifications of ALB (Assembly Line Balancing). Depending on the problem we need to solve while creating a balance, two types emerge. In 90% of cases, this is TYPE 1, where the cycle time is known, and our task is to determine the number of assembly stations and select the appropriate heuristic and present the solution. The second, much less common problem is a situation where an assembly line with a specific number of stations already exists, and our task is to select the appropriate cycle time and heuristic so that our new product makes the best use of the existing line. This case is called TYPE 2.
The literature has proposed, among other things, a classification of the ALB structure based on the type of production. In the case of creating only one type of product, we are dealing with a single-model line (Fig. 1). When we manufacture many types of the same product, the line is called multi-model (Fig. 2). We encounter a mixed-model line (Fig. 3) when we produce different groups of products. It should be noted that this is one of many classifications of assembly lines, and in practice, many other distinctions can be found due to line time (deterministic and stochastic) or methods of operation (automatic, manual, or mixed). (…)
The article contains 21,070 characters.
Just-in-time strategy in the assembly line balancing problem – PDF file for download