Abstract: The paper presents a model of a system designed for the offshore installation of modules necessary for transporting oil and gas from seabed wells. The system is mounted on specialized vessels equipped with dynamic positioning systems. One of the most important elements of the system is the AHC (Active Heave Compensation) system, which compensates for vessel movements caused by waves.A simplified pneumatic-hydraulic system was used, along with appropriate algorithms for controlling winch operation. The load is lowered to the seabed using a compensated winch. Additional guide ropes for the load were also modeled.
The results of sample numerical calculations are presented for a system operating under specified conditions, with the module guidance system enabled and disabled during installation.
1. INTRODUCTION
Crane systems used in handling operations were until recently characterized by manual operation. Much depended on the experience and diligence of the machine operator. In the last decade, there has been significant progress in the field of automation of handling equipment (cranes, overhead cranes, etc.). This is particularly visible in cranes and other equipment used in offshore conditions. The technical solutions used in the industry are very diverse. Undoubtedly, the most effective machines here are offshore cranes, which have numerous advantages. However, as a rule, their price is very high, and this type of device is not always the most suitable for certain tasks. A-frames, towers for handling dedicated modules, or winch systems with solutions supporting the load-bearing rope are often used. The article presents a system for lowering and lifting modules used in the operation of offshore pipelines in oil and gas fields. (…)

The article contains 14626 characters.

Source: Logistyka Magazine

Installation of offshore infrastructure elements with a dedicated MPHS system – PDF file for download