What determines the construction of a warehouse? New realities of warehouse investments: less risk, more requirements.
Pre-let as a significant factor
Currently, we are observing the highest investment activity in projects that have secured a pre-let of at least 50-60% of the space. Such a level of leasing is often a prerequisite for starting construction. Developers today place great emphasis on risk mitigation, which makes fully speculative developments a rarity.
The market has clearly polarized. On one hand, there are entities such as GLP, CTP, or Hillwood, which are still actively developing speculative projects – mainly in prime locations where demand is stable and predictable. On the other hand, there are developers who prefer the pre-let model, launching investments only after signing lease agreements.
BTS (build-to-suit) and BTO (build-to-own) projects still constitute a significant market segment, especially in the case of tenants with specific technical requirements or those interested in property ownership. However, they are implemented selectively, mainly by experienced developers specializing in “tailor-made” solutions.
Revitalization and conversion of post-industrial areas are also gaining importance, particularly in the context of urban logistics and limited land availability in metropolitan areas. Although their market share remains small, this trend is gradually strengthening.
Therefore, the priority today is projects with an appropriate level of pre-let, rather than a specific type of investment. Client availability and the level of lease security determine whether a project will be implemented, regardless of whether we are talking about a speculative facility, BTS, or BTO.
ESG – no longer a competitive advantage, but a necessity
Green certificates, such as BREEAM or LEED, are increasingly becoming a market standard in the warehouse sector. It is currently difficult to find a new project that does not include environmental certification at the planning stage. A minimum BREEAM Very Good level is now the norm, and most developers building Class A facilities aim for the Excellent level.
Warehouses with BREEAM Outstanding certification are already appearing on the market, which testifies to the industry’s growing commitment to sustainable development and the increasingly high ambitions of developers. For investors, ESG aspects are becoming one of the key criteria – they influence not only the decision to engage in a project but also its subsequent valuation.
It is worth emphasizing that certification today also has a measurable impact on financing. Banks financing investments are increasingly conditioning credit terms on ESG scoring results, in which environmental certificates play a significant role. As a result, they cease to be merely an image-building tool and become a real element that builds the value of the property.
In summary – environmental certification is no longer a competitive advantage, but an applicable standard. In many cases, it is even a necessary condition for a project to be implemented or sold.
Investment brakes
One of the most common barriers delaying the implementation of warehouse and production investments is prolonged administrative procedures, especially those related to obtaining environmental decisions and building permits. The most difficulties concern production investments in large metropolitan areas, where the environmental procedure itself can take up to 2 years.
The last 3 years have also shown what a major challenge it has become to secure adequate connection capacities – especially for companies planning to open production plants in Poland. The increasing demand for energy, combined with the limited availability of serviced land, makes finding a plot with quick access to electricity increasingly difficult. The connection completion dates offered by energy operators often reach several years, which significantly hinders the efficient start of an investment.
Additional barriers include:
- lack of local spatial development plans, which forces investors to obtain decisions on land development conditions,
- complex administrative procedures, especially in the case of projects planned in the vicinity of residential buildings,
- unregulated ownership issues – e.g., legal disputes, claims, or the need to consolidate plots.
It is production projects that most often encounter the greatest formal and legal challenges. The availability of infrastructure and the length of administrative procedures are becoming key factors today that realistically affect the pace of investment implementation.
Source: Avison Young