
Test operation of the latest Vectron DC locomotive began on May 27, 2013. The purpose of the tests is to verify whether the modern solutions applied in it can contribute to increasing the efficiency of CTL Logistics’ transport services.
The operation of the locomotive aims to verify its traction capabilities for the conditions of operating trains by CTL Logistics. Additionally, modern design solutions will be checked, both in the mechanical and electrical power parts, as well as their impact on vehicle reliability, i.e., a factor significantly affecting the quality of rail services provided.
– We want to constantly develop in order to best meet the expectations of our customers. Safe, fast, and reliable transport is our priority. The experience from the conducted Vectron DC operation will give us the answer to the question of whether and how we can further improve the quality of our services – says Jacek Bieczek, CEO of CTL Logistics.
The DC version of the locomotive belongs to the Vectron locomotive design family, powered by 3 kV DC voltage, with a power of 5.2 MW and a maximum speed of 160 km/h. The locomotive is intended for operation in Poland, both for hauling freight trains and passenger trains. The vehicle is manufactured in accordance with current environmental protection requirements.
– Starting tests of the new generation of locomotives is another step in the consistently implemented rolling stock policy regarding line locomotives. The experience gathered from the conducted operation will constitute a valuable source of information and will complement the directionally modeled rolling stock policy – adds Mariusz Mik, Member of the Management Board, Chief Operating Officer of CTL Logistics Sp. z o.o.








