System crisis – “build-to-stock” production
The contemporary production system in the automotive industry of European and American countries is based on manufacturing a large number of vehicles based on sales forecasts.
Changing customer tastes, high competitiveness from other manufacturers, or unexpectedly changing global economic conditions often lead to production and sales forecasts not aligning with market realities. Customers lose out on this, as they do not receive a satisfactory product or have to wait a long time for it because the manufacturer is unable to quickly change the production line to adapt to consumer needs. By clogging warehouses and factory lots with specific brands and types of cars, manufacturers are unable to adapt quickly to market changes, relying only on the hope that estimated demand will largely coincide with the commercial offer within a specific time frame.
An analysis of the subject literature shows that in recent years, about half of all vehicles in Europe were produced for stock. In the USA, however, assembly plants produced cars almost exclusively for stock, which led to the creation of an average two-month inventory (Figure 1). Such production systems generate enormous costs for maintaining inventories and warehouses, as well as the associated costs of “clearing” warehouses of these stocks. Their scale was estimated in the entire global automotive industry at 80 billion USD annually, or in relation to one final product, at an amount of 500 to 1,500 dollars, which is effectively added to the final price of the vehicle. When manufacturers produce many vehicles “for stock,” customers, on the other hand, have to wait on average longer than a month for the delivery of cars assembled according to their individual wishes. M. Holweg and F. K. Pil, in a special study examining five selected manufacturers, determined the average delivery time to be 40 days, with a range from 20 to almost 100 days in extreme cases. In the case of leaders, the delivery time for cars assembled to customer orders currently ranges, depending on the manufacturer, from 10 days (BMW), through 14-15 days (Daimler Chrysler, Toyota, VW, Volvo) to 20-21 days (GM, Renault).
The “build-to-stock” strategy (BTS, or Push strategy) is primarily focused on high efficiency and maximizing production. It is assumed here that functional products will be manufactured for which there will be no problem with sales, as potential demand can be estimated quite accurately. Therefore, at the stage of planning production programs, an indicative demand forecast is used, assuming that warehouse stocks will be reduced by current customer demand. Manufacturing a large quantity of products or final goods guarantees, in theory, high availability of products (those enjoying the greatest popularity), ensures coverage of estimated demand, shortens customer waiting times for goods, ensures continuity of the production cycle, and provides relatively stable employment for workers. The only condition that must be met is the consistency of actual demand with the forecast.