Business environment and its implications for changes in work organization and the organizational structure of a manufacturing enterprise – research report – part 2

Business environment and its implications for changes in work organization and the organizational structure of a manufacturing enterprise - research report - part 2

Business environment and its implications for changes in work organization and the organizational structure of a manufacturing enterprise – research report – part 1

The article is based on the authors’ practical experience. The solutions presented below are currently in operation at the studied enterprise. A production plant belonging to an international corporation that has been operating in Poland for years decided to implement them. The deterioration of the general situation in which this enterprise operates was caused by the economic slowdown.

In the described plant, actions were taken to implement the Lean management philosophy. This plant implemented some Lean tools, such as the 5S system and SMED (Single-Minute Exchange of Die). As a result, those involved in the production management process saw the potential in these solutions to increase efficiency and reduce operating costs without radical spending cuts. The solutions described below are in line with this concept.
To ensure these actions were not just a one-time activity, the company’s management decided to change the organizational structure and create the position of a factory change agent. The role of the person in this position will be to oversee the implementation of various Lean methods and tools in the assigned production area. These actions are permanent and concern every aspect of the company’s operations. Thanks to these changes, the approach to the production process will be linked to a process of continuous optimization.

Transferring some maintenance department duties to production employees
The maintenance department plays a responsible role in a production plant. The efficiency and availability of the plant’s equipment and technological lines depend on how these duties are performed. The role of employees in the maintenance department is to repair breakdowns and perform preventive work to protect the aforementioned equipment from potential failures. Due to historical circumstances, these employees in the discussed plant also performed other tasks unrelated to their main duties. This resulted in a lack of time for basic tasks. Consequently, machine breakdowns began to occur frequently because a specific part was not replaced on time. In this situation, the plant management decided that some of the duties currently performed by these employees should be transferred to production employees. These activities are related to the daily use of production equipment and machines and do not require complex knowledge or skills. Additionally, this increased the responsibility of production employees for the finished product.

A decision was made to transfer certain activities from the maintenance department to the production department. This involved purchasing basic tools for the packaging department employees, such as screwdrivers, Allen keys, or pneumatic screwdrivers. Before transferring the duties, a minimum standard set of such tools was established, and one such set was purchased per shift team. These tools were then handed over to individual employees against a personal receipt for the aforementioned set. In the event of destruction or damage to a tool, the employee reports this fact directly to their supervisor and shows the tool. This avoids situations where an employee reports a tool as damaged when, in reality, it is being taken out of the plant. Tool sets are stored directly in the production halls in lockable metal cabinets purchased specifically for this purpose. Thanks to these changes, better results were achieved in the previously implemented SMED project, which aimed to speed up the changeover of production machines during the product assortment change process.