
Ericsson and Swiss Federal Railways (SBB) have successfully completed Europe’s first operational integration of the legacy GSM-R railway communication system with a modern IP Multimedia Subsystem (IMS) platform using Voice over LTE (VoLTE) service.
This critical infrastructure upgrade ensures uninterrupted, nationwide railway connectivity across Switzerland’s 3,100 km rail network, preparing it for the Swisscom 3G shutdown scheduled for the end of 2025. Additionally, onboard 4G support has been improved in approximately 1,000 trains, setting a new standard for connectivity and reliability for SBB’s rail services.
For years, roaming voice calls used in Swiss railway communications relied on the public Swisscom 3G network in areas where GSM-R coverage was unavailable. Due to Swisscom’s decision to shut down 3G services, railway operators in Switzerland faced an urgent need to modernize their systems. One solution was to expand the aging GSM-R, but SBB turned to Ericsson to implement a future-proof solution based on IMS and VoLTE, combining the functions of GSM-R railway systems with modern mobile and fixed-line telephony systems.
Ericsson successfully designed and implemented this solution, integrating technologies from various vendors into a unified, convergent IMS core. Demonstrating resilience and a forward-looking approach to innovation, the new system now provides continuous, end-to-end railway connectivity, setting new standards for operators across Europe facing the decommissioning of legacy telecommunications systems.
Ericsson’s deployment strategy prioritized zero service downtime and full compliance with safety requirements. Key elements of the IMS implementation included IMS–GSM-R interworking, adaptation of the GSM-R numbering plan, and mandatory safety-critical functions such as emergency train stop calls. Since June 2023, the IMS/VoLTE integration has undergone rigorous testing phases:
- June 2023: Platform deployment begins
- Early 2024: Successful completion of the first end-to-end VoLTE-GSM-R calls
- January 2025: Extensive field tests using pilot trains, certified by the Swiss Federal Office of Transport
- April 2025: Nationwide system launch ahead of schedule.
- Currently, in December 2025, the new infrastructure is already operational, with approximately 450 trains and 1,000 operational devices using VoLTE technology without any downtime.
The operational IMS/VoLTE platform provides high-performance railway connectivity and modern, scalable dispatcher telephony, while reducing the risks and limitations associated with the legacy infrastructure. Key features typical of the railway sector, including EIRENE (European Integrated Radio Enhanced Network) functional numbering, emergency train stop calls, group calls, and onboard announcements, have been fully preserved. Thanks to the implementation of 4G/5G services, the Swiss rail network avoids service interruptions resulting from the 3G shutdown while simultaneously creating a foundation for future innovations based on the Future Railway Mobile Communication System (FRMCS) using 5G technology. So far, migrations have proceeded without disruption, supported by extensive training for SBB operational teams.
Our collaboration with SBB shows that we can deliver complex digital transformation projects within very tight timeframes. We look forward to continuing to set standards in innovation for railway communications and supporting the transition to FRMCS in the coming years.
– comments Nicolas Segond, Head of Mission Critical Communications for Railways in Europe, Middle East and Africa at Ericsson.
Although the full migration of rolling stock connectivity and mobile devices is still ongoing and is expected to be completed in December 2025, the collaboration has paved the way for further improvements. Valuable experience will be used to develop strategies for similar railway transformations worldwide.
Source: Ericsson








