
The alliance of intermodal operators Loconi Intermodal and Baltic Rail has connected the BCT – Baltic Container Terminal in Gdynia and the Port of Koper in Slovenia.
The initiative is based on currently operating intermodal and maritime services. From July this year, Loconi is launching a new rail service from BCT to Wrocław. Baltic Rail has long offered a connection from Wrocław to Koper. In this way, ports at both ends of the Baltic – Adriatic European Corridor are connected, which opens up a much faster and more efficient transport route from Mediterranean countries to Scandinavia (and vice versa).
Currently, many shipping lines offer such connections, transporting containers around the European continent with two (or more) transshipments at base ports, which results in a total transit time of 20-30 days. The use of a fast and frequent rail connection across the continent and the use of existing short-sea shipping connections handled at BCT and Koper will cut the container transit time on this route by half. For example, the transit time from Israeli and Egyptian ports to Swedish ports will be approx. 14 days, and from Turkey only 10 days. The cost of transport using the Koper – BCT Gdynia land bridge does not differ significantly from the level of sea freight rates.
What distinguishes this initiative from previous attempts to connect the Adriatic and Baltic ports is the fact that it uses existing connections and is non-investment in nature. All intermodal and maritime services already exist and operate in their local markets. The Bridge initiative merely connects and coordinates them into one comprehensive service.
The joint initiative of the port of Koper, BCT, Loconi and Baltic Rail will increase competitiveness in the international sea and land transport market.
Source: BCT Gdynia








