⚙️
🌟 Najlepsze dopasowanie
Wpisz szukaną frazę, aby zobaczyć propozycje AI.

PKP invests in station modernization

Photo: PKP SA

Innovative System Stations (IDS) are a proprietary project of PKP SA, involving the design and construction of small, modern railway stations tailored to local needs. Thanks to the railway company’s efforts, the first such facility will appear in the Greater Poland Voivodeship this year.

The station in Nowy Tomyśl, the construction of which began in September last year, will be built in a new location. The facility will be situated closer to the underpass leading to the platforms, allowing passengers to reach trains faster. The new building will include a glass-walled waiting room, a ticket office, and restrooms. Bicycle racks for a total of 26 bikes and a repair station will be installed on both sides of the station. The area in front of the building will be developed with street furniture, including benches and trash cans. As part of a parallel municipal investment, a new road layout, parking spaces, and a bus loop will be created. In the future, the station will serve as part of a functional transport hub.

A smaller facility will be the station in Wasilków in the Podlaskie region, where PKP SA has just handed over the construction site to the contractor. The future building will also be constructed in a new location. The station will feature a waiting room and public restrooms. Ticket machines will be placed under a spacious canopy. Space has also been provided for an ATM and a parcel locker. As part of the site development in front of the station, the contractor will install street furniture (trash cans, an information display case, benches) and 13 bicycle racks with a repair station. There will also be 8 parking spaces.

– The year 2020 was difficult and full of challenges. However, the ongoing epidemic did not stop Polish railway and road investments. We are building new stations and modernizing existing ones. We are building and rebuilding railway stations and lines. We are modernizing rolling stock. We are opening new sections of expressways and motorways. Polish infrastructure is becoming increasingly modern. This is evident in the example of the Station Investment Program. In the past year, we have commissioned 9 new and modernized PKP stations. Dozens more such investments are ahead of us – including in Nowy Tomyśl and Wasilków. Each of these investments brings us closer to the goal of a safe, comfortable, and predictable Polish railway – said Minister of Infrastructure Andrzej Adamczyk.

A characteristic feature of IDS stations is their ecological solutions. These will also be present at the stations in Nowy Tomyśl and Wasilków. Photovoltaic panels will be installed on the roofs of both facilities to harvest solar energy. Energy-efficient LED lighting with control automation will also be featured – the stations will brighten up more when a train enters the station. Additionally, a rainwater recovery system will be installed on the roof of the Nowy Tomyśl station to be used for flushing toilets in the building.
Both facilities will also be fully adapted to the needs of people with disabilities. Among the solutions to be implemented in the buildings are tactile paths for the blind and visually impaired, Braille signage, induction loops, and tactile station maps. Restrooms will also be adapted for people with reduced mobility. Additionally, at the Wasilków station, one of the newly created parking spaces will be reserved for people with disabilities.

– We have started the construction of further system stations according to the proprietary project of PKP SA. Thanks to their small size, the new buildings are better adapted to the current needs of passengers. Just this year, residents of Czeremcha, Bielsk Podlaski, Oświęcim, Sędziszów Małopolski, and Nidzica have seen this for themselves. Soon, they will be joined by travelers at the stations in Dobczyn and Barchów, where construction work recently began, as well as passengers using the stations in Nowy Tomyśl and Wasilków – says Ireneusz Maślany, member of the PKP SA management board.

Safety levels will increase at the new stations. The investment includes the installation of monitoring systems. Access control and remote facility locking systems will be introduced, as well as an intrusion alarm system. The entire installation and equipment will be managed by BMS (Building Management System) systems, which are planned to optimize electricity and heat consumption. Both buildings will feature a Dynamic Passenger Information System – electronic train departure and arrival boards. In the waiting rooms, passengers will be able to use public Wi-Fi.

– Our priority is to ensure better access to the railway as well as safety and comfort of travel. Thanks to the investment of national funds and EU funds, new railway stations are being built and adapted to the needs of all passengers. Polish stations are not only becoming more beautiful but also environmentally friendly – says Deputy Minister of Funds and Regional Policy Waldemar Buda.

The cost of building the system station in Nowy Tomyśl will be approximately 4.8 million PLN gross, and in the case of the Wasilków station – approximately 3.7 million PLN gross. Both investments will be co-financed with EU funds under the Infrastructure and Environment Operational Program. The completion of the station in Nowy Tomyśl is planned for the first half of 2021. The finalization of the station in Wasilków is expected in the second half of 2021. Both investments are being carried out by the company SKB SA under a “design and build” formula.

Source: PKP SA

Read also about railway infrastructure:
– Ambitious plan – 200 new railway stops in Poland
– Development of logistics services in rail freight transport