⚙️
🌟 Najlepsze dopasowanie
Wpisz szukaną frazę, aby zobaczyć propozycje AI.

Refusal to load goods despite the driver’s presence at the loading site

Refusal to load goods despite the driver's presence at the loading site

A carrier reported a problem they experienced while attempting to load goods. The company’s driver arrived at the designated time for a partial load (several pallets had already been loaded earlier). Upon arrival, the warehouse staff “threw” two pallets, 2 meters high and weighing over 400 kg in total, right into the middle of the vehicle and stated that the driver had to arrange and secure them himself. The driver refused to do so due to the nature of the goods (expensive and very delicate). Consequently, the warehouse staff removed these two pallets from the vehicle and closed the ramp, thereby refusing to reload and arrange the goods on the trailer. Explaining the situation took some time; the driver waited for the loading, while in the meantime, the freight forwarder put their cargo on a transport exchange without informing either the driver or the carrier. I would appreciate advice on what to do in this situation.

Expert response: First of all, remember to train drivers to always enter reservations on the CMR consignment note if there is improper loading or improper arrangement on the trailer.

Secondly, inform the freight forwarding company about problems and request instructions via email or the exchange chat, rather than by phone, to have evidence that the carrier fulfilled their obligations.

Thirdly, if the carrier did not receive the cargo, they should try to arrange a partial load on the exchange, of which it is worth taking screenshots. You can look for a partial load as long as time permits, so that there is no delay in the delivery of goods that were already loaded earlier. The company must demonstrate that it made attempts to find a partial load. If successful for a lower freight rate, it can then charge the client for the difference. If unsuccessful, it can calculate the resulting damage. The carrier may claim lost profits, i.e., the entire freight rate minus what was saved by not executing the order. When calculating savings, one must subtract the costs that would have been incurred anyway while executing the order, and one can claim what the company could have earned by executing it. Therefore, one should subtract from the freight rate what was saved by not performing this route, calculating the fuel saved by not driving to the unloading point and driving with a lighter load, or road tolls that did not have to be paid.

Legal basis:

Legal status of the publication (date): 2018-06-21