Construction is an industry sector significantly linked to logistics. This relationship is described and stems, among other things, from the specific nature of construction, which involves the immobility of the construction product and location-related conditions. This primarily necessitates the delivery of basic production resources – materials.
However, the connection between construction and logistics does not end there. One must also include elements of service logistics related to human resource management, as well as information logistics related to the flow of information that controls execution. All these elements must be considered and properly coordinated at the project planning stage so that they support the core construction production during execution without becoming an obstacle to completion.
Planning the execution of a construction project
The execution of a construction project is one of the stages of the construction investment process. It is often preceded by a long-term process during which design documentation is prepared and developed, a series of approvals and permits are obtained, a contractor is acquired, etc. Planning the project execution is one of the final tasks before starting the investment. As a rule, design documentation already exists, and based on it, among other factors (location, type of contract, method of execution), the contractor usually analyzes the subsequent technological processes that must be performed to complete the project. These analyses are conducted in terms of the duration of execution resulting from binding contracts, cost determined by the execution budget, and quality, which is linked to earlier stages (low quality means, among other things, the cost and time of implementing corrective plans). One of the issues that must be subject to such analysis is logistics. At the planning stage, these generally concern the supply of materials and construction equipment to the site. At the same time, it seems that the term service logistics can describe processes related to acquiring and subsequently managing services associated with the execution of processes by human resources. Among these three elements of construction production (labor, materials, equipment), materials have the largest share in execution and generally represent the most tangible link between construction and logistics. Therefore, at the investment planning stage, the contractor makes fundamental decisions regarding the concept of supplying the construction site with building materials. Common solutions include the use of on-site warehouses and storage areas, central warehouses, logistics centers, “Just in Time” purchasing systems, or even the location of on-site mobile prefabrication or concrete mixing plants in situations where their transport is too costly and the risk associated with delivery timeliness is increased. At the same time, it is worth emphasizing that the issue of logistics does not only refer to materials or other production components. Information logistics is very important in the project execution process, and the success of the project often depends on it. Through the flow of information, all processes—technological and organizational—are controlled. The flow of information also triggers the stream of financial resources. It follows that information logistics plays a significant role in controlling the execution of the project.
The article contains 25,180 characters.
Source: Logistyka Magazine