Within the framework of European regulations, two groups of requirements can be distinguished that will have a direct impact on the technologies used in Poland for HSR purposes. Both are directly related to the creation of a common market in the European Union for products and services for rail transport: 1. Procedures for design, modernization, and construction of both railway lines and rolling stock. 2. Technical and operational requirements for HSR. General requirements for procedures, the application of which is ultimately intended to lead to proper commissioning, are contained in: • The “new approach” legislative rules (EU Council Resolution of 1985 on harmonization and standardization, as amended); and
• Conditions for unified conformity assessment (EU Council Resolution of 1989 on certification and testing, as amended); which have been collectively transposed into Polish law by the Act on the Conformity Assessment System of August 30, 2002, as amended.
Detailed procedures, as well as detailed technical and operational requirements, are defined for individual subsystems of the trans-European high-speed rail system. These subsystems were defined in Directive 96/48/EC, amended by Directive 2004/50/EC, and the relevant provisions were transposed into Polish law (Act on Rail Transport, Chapter 4a). For all the mentioned subsystems, detailed EU regulations have been developed and issued in the form of European Commission Decisions, referred to as Technical Specifications for Interoperability (TSI).
In particular, the following European Commission Decisions are relevant to the scope of this paper:
• in the field of rail traffic control for HSR, defining technical, operational, and procedural requirements, and in particular regarding the use of unified European communication systems (GSM-R) and safe train control (ETCS), which together form the European Rail Traffic Management System ERTMS (TSI HS CCS: EC Decision 2006/860/EC of 07.11.2006, EC Decision 2007/153/EC of 06.03.2007)
• in the field of telematic applications for HSR, defining technical, operational, and procedural requirements for telematic applications for passenger services (adopted by European Commission Regulation 454/2011 and Commission Regulation (EU) No 454/2011 of 5 May 2011 on the technical specification for interoperability relating to the ‘telematic applications for passenger services’ subsystem of the trans-European rail system). (…)
The article contains 114,804 characters.
Source: Logistyka Magazine







