On May 21, 2011, the christening ceremony of the container ship “Port Gdynia” took place at the Gryfia Ship Repair Yard in Szczecin.

This is the last ship built at the liquidated Szczecin Shipyard Nowa, ordered by Aranda Sp. z o.o. for Pol – Euro Linie Żeglugowe S.A. in Gdynia. The ship is 220 m long and 32.2 m wide. Its capacity is approximately 3100 TEU, i.e., 20-foot containers. The container ship is one of a series of 25 similar B 178 type universal ships built at the Szczecin Shipyard Nowa. The container ship was outfitted by SSR Gryfia S.A. The ship’s godmother was Anna Wypych-Namiotko, Undersecretary of State at the Ministry of Infrastructure.









