The MLP Group team of specialists thoroughly familiarized themselves with the specifics of Edelmann’s business by conducting a detailed analysis of the client’s needs and expectations and proposed a “tailor-made” solution in one of the existing facilities at the MLP Pruszków I industrial and warehouse park. The hall selected for the investment for Edelmann is characterized by very good technical parameters. Heating, ventilation, daylight illumination of the hall, and thermal insulation have been designed to a class meeting the standards for production halls. Choosing a hall adapted for production activities will significantly shorten the time required to adapt the space for the needs of the printing house. Specialized technological infrastructure, including advanced heating, ventilation, air conditioning, and humidification systems necessary in the printing process, was developed in cooperation with an engineering office that has been a long-term partner of MLP Group. MLP Group focused on coordinating the external technical infrastructure and is providing formal and legal supervision over the investment.
The production hall, along with the existing external office and social building, is subject to adaptation. Due to the high number of employees at Edelmann, a 2-story administrative, social, and technical section will be additionally built inside the hall.








